Nvidia Reports $115.8B Q3 Revenue, Up 103% Year-Over-Year on AI Demand
Nvidia posted $115.8 billion in Q3 FY2027 revenue — a 103% year-over-year jump — with Data Center revenue hitting $107.6 billion, up 110% annually.
Top Stories
All Sections
Finance
About
13 results for "data-center"
Nvidia posted $115.8 billion in Q3 FY2027 revenue — a 103% year-over-year jump — with Data Center revenue hitting $107.6 billion, up 110% annually.
LG Energy Solution unveiled integrated battery and power systems specifically engineered for AI data centers at RE+ 2026 in Las Vegas, targeting more than 50 GWh of North American ESS production capacity by year-end.
FuelCell Energy will host the first DOE-backed testbed for AI data center power systems at its Connecticut facility, treating AI computing's unprecedented electricity demands as an engineering research problem rather than a procurement one.
A major MIT Technology Review investigation found only one grid operator across China, the U.S., and Europe with a working AI optimization program — directly challenging the industry narrative that AI and clean energy are natural partners.
New research argues that physics-informed AI—models constrained by actual power system laws—outperforms standard neural networks for electricity grid planning as data-center demand and climate volatility push grids beyond historical data ranges.
AI data center construction spending has reached parity with general office construction in the U.S., while organized community opposition is intensifying in Louisiana, Arizona, Michigan, and Texas over water, power, and land use.
A UN University report warns AI data centers consumed 4.5 trillion litres of water in 2025 and could hit 9.3 trillion by 2030 — rivaling global drinking water needs.
AI automation is shrinking office space demand while data center outlays have risen to match general office construction spending for the first time, driving 'Powered Land' near substations to $150,000 per acre.
SoftBank pledges €75 billion for 5 gigawatts of AI data center capacity in France—Europe's largest AI infrastructure commitment—brokered directly between Masayoshi Son and President Macron.
AI workload scheduling — not new power plants — is the fastest available solution to data center grid stress, as AI forecasting now predicts renewable output at 95%+ accuracy.
AI's energy demand is accelerating renewable buildout through hyperscaler procurement commitments — but the feedback loop is policy-dependent and could reverse if clean-energy matching requirements aren't enforced.
Community opposition to AI data center construction is spreading nationwide, driven by concerns over water use, grid strain, and industrial noise — and now it's reaching governors' desks.
Microsoft is weighing whether to abandon its 2030 goal of matching 100% of its electricity with carbon-free energy on an hourly basis, as AI data center demand outpaces renewable deployment.